|  | 
								
									|  | 
								
									| Realization | 
								
									|  | 
								
									|  | Always think and act in the interest of the Customer | 
								
									|  | Intensive use of Check Lists | 
								
									|  | Document early, continuously, carefully (UML, JavaDoc, Templates) and usable (hyperlinked) | 
								
									|  | 
								
									|  | 
								
									|  | 
								
									| 1. Project Initialization (15% of project time) | 
								
									|  |  | 
										Analyze the Top-Level SpecificationUse check lists to ensure a complete coverage of user requirementsPrepare an initial realization proposalDiscuss with the partner/user what he needs - NOT what he wishesAnalyze the Detail Specification and the Requirements ListPrepare the final realization proposalPrepare and sign the contract | 
								
									|  | 
								
									| 2. Project Realization | 
								
									|  | 
								
									|  | OO - Cycle (OO: object oriented) | 
								
									|  | 
								
									|  |  | 
										Specify the DesignWrite a Test SpecificationImplement the ComponentTest and write the Test ProtocolWrite the Installation-/Operation ManualWrite the System DocumentationExamine the system and write the Correction list (if necessary) | 
								
									|  |  |  | 
								
									| 3. Receive the Contract fulfillment Confirmation | 
								
									|  |  |  | 
								
									|  |  |  | 
								
									|  | 
								
									|  |